Winlock, WA 98596 solar market data
Updated December 6, 2018Older data · growth withheldProvisional score · under 500 installs By The SolarDNA Data Team
Winlock 98596 has 7 solar installations at a median installed cost of $3.57/W, recent growth not yet measurable, and a Market Score of 43 — higher than 55% of U.S. zip markets.
Versus Washington
How 98596 compares with the state
Installed cost
$0.12/W above
state median $3.45/W
Market score
43 vs 39
Washington scores 39
Share of state installs
0.09%
of 7.4K tracked statewide
Battery attach
0.0%
state 0.0%
Statewide momentum
▼ 13.4%
residential solar added in Washington, 12 months through Jul 2026
Statewide market
61.6K systems
3.1% of homes · utility-reported through Jul 2026
Growth & pricing
98596 by year
5 installs in the trailing twelve months vs 2 before
Installations by year
Median installed cost, $/W DC by year
Installer comp set
Who installs in 98596
Ranked by systems recorded in this zip
| # | Installer | Installs | 12-mo | Avg kW | $/W |
|---|---|---|---|---|---|
| No installer has recorded systems here yet. | |||||
Equipment
What gets installed in 98596
Share of systems with a recorded brand
Modules
ITEK ENERGY100.0%
Inverters
ALTENERGY POWER SYSTEM28.6%
UNKNOWN28.6%
FRONIUS14.3%
SCHNEIDER ELECTRIC SOLAR INVERTERS USA14.3%
SOLAREDGE14.3%
Frequently asked
Quick answers about 98596
How many solar installations are there in 98596?
SolarDNA counts 7 active solar installations in Winlock 98596, 7 of them residential, with data through December 6, 2018.
How much does solar cost in 98596?
The median residential system in 98596 cost $3.57 per watt over the trailing twelve months, $0.12/W above the Washington median.
Is solar growing in 98596?
Recent growth cannot be measured yet for 98596: insufficient recent data (data runs through December 6, 2018).
Who installs solar in 98596?
No installer has enough recorded systems in 98596 to rank yet.
Is 98596 a good market for solar sales?
98596 scores 43 out of 100 (Good, higher than 55% of U.S. zip markets). With under 500 installations the score is provisional.