Chehalis, WA 98532 solar market data
Updated May 28, 2019Older data · growth withheldProvisional score · under 500 installs By The SolarDNA Data Team
Chehalis 98532 has 27 solar installations at a median installed cost of $3.72/W, recent growth not yet measurable, and a Market Score of 42 — higher than 49% of U.S. zip markets.
Versus Washington
How 98532 compares with the state
Installed cost
$0.27/W above
state median $3.45/W
Market score
42 vs 39
Washington scores 39
Share of state installs
0.36%
of 7.4K tracked statewide
Battery attach
0.0%
state 0.0%
Statewide momentum
▼ 13.4%
residential solar added in Washington, 12 months through Jul 2026
Statewide market
61.6K systems
3.1% of homes · utility-reported through Jul 2026
Growth & pricing
98532 by year
19 installs in the trailing twelve months vs 7 before
Installations by year
Median installed cost, $/W DC by year
Installer comp set
Who installs in 98532
Ranked by systems recorded in this zip
| # | Installer | Installs | 12-mo | Avg kW | $/W |
|---|---|---|---|---|---|
| No installer has recorded systems here yet. | |||||
Equipment
What gets installed in 98532
Share of systems with a recorded brand
Modules
ITEK ENERGY88.9%
SILFAB SOLAR7.4%
LG ELECTRONICS3.7%
Inverters
SOLAREDGE59.3%
ALTENERGY POWER SYSTEM29.6%
FRONIUS USA3.7%
SMA AMERICA3.7%
UNKNOWN3.7%
Frequently asked
Quick answers about 98532
How many solar installations are there in 98532?
SolarDNA counts 27 active solar installations in Chehalis 98532, 24 of them residential, with data through May 28, 2019.
How much does solar cost in 98532?
The median residential system in 98532 cost $3.72 per watt over the trailing twelve months, $0.27/W above the Washington median.
Is solar growing in 98532?
Recent growth cannot be measured yet for 98532: insufficient recent data (data runs through May 28, 2019).
Who installs solar in 98532?
No installer has enough recorded systems in 98532 to rank yet.
Is 98532 a good market for solar sales?
98532 scores 42 out of 100 (Good, higher than 49% of U.S. zip markets). With under 500 installations the score is provisional.