Installers / WATTS UP ENGINEERING
WATTS UP ENGINEERING
Active in 1 state · first install 2022-05-25 · latest 2024-09-20
Installations
19
Capacity
217.1 kW
Last 12 months
1
▼ 92.3% vs prior 12 mo
Footprint
1 states
WI
By state
| State | Rank | Installs | 12 mo | Avg kW | $/W | Battery % | Zips |
|---|---|---|---|---|---|---|---|
| Wisconsin | #70 | 19 | 1 | 11.43 | $3.00 | 0 | 17 |