Everson, WA 98247 solar market data
Updated March 29, 2019Older data · growth withheldProvisional score · under 500 installs By The SolarDNA Data Team
Everson 98247 has 21 solar installations at a median installed cost of $2.87/W, recent growth not yet measurable, and a Market Score of 46 — higher than 73% of U.S. zip markets.
Versus Washington
How 98247 compares with the state
Installed cost
$0.59/W below
state median $3.45/W
Market score
46 vs 39
Washington scores 39
Share of state installs
0.28%
of 7.4K tracked statewide
Battery attach
0.0%
state 0.0%
Statewide momentum
▼ 13.4%
residential solar added in Washington, 12 months through Jul 2026
Statewide market
61.6K systems
3.1% of homes · utility-reported through Jul 2026
Growth & pricing
98247 by year
13 installs in the trailing twelve months vs 8 before
Installations by year
Median installed cost, $/W DC by year
Installer comp set
Who installs in 98247
Ranked by systems recorded in this zip
| # | Installer | Installs | 12-mo | Avg kW | $/W |
|---|---|---|---|---|---|
| No installer has recorded systems here yet. | |||||
Equipment
What gets installed in 98247
Share of systems with a recorded brand
Modules
ITEK ENERGY71.4%
SILFAB SOLAR23.8%
CSI SOLAR4.8%
Inverters
FRONIUS USA42.9%
ALTENERGY POWER SYSTEM14.3%
SMA AMERICA14.3%
SOLAREDGE9.5%
ENPHASE ENERGY4.8%
Frequently asked
Quick answers about 98247
How many solar installations are there in 98247?
SolarDNA counts 21 active solar installations in Everson 98247, 21 of them residential, with data through March 29, 2019.
How much does solar cost in 98247?
The median residential system in 98247 cost $2.87 per watt over the trailing twelve months, $0.59/W below the Washington median.
Is solar growing in 98247?
Recent growth cannot be measured yet for 98247: insufficient recent data (data runs through March 29, 2019).
Who installs solar in 98247?
No installer has enough recorded systems in 98247 to rank yet.
Is 98247 a good market for solar sales?
98247 scores 46 out of 100 (Great, higher than 73% of U.S. zip markets). With under 500 installations the score is provisional.