Line Lexington, PA 18932 solar market data
Updated June 8, 2026Provisional score Β· under 500 installs By The SolarDNA Data Team
Line Lexington 18932 has 9 solar installations at a median installed cost of $5.60/W, recent growth not yet measurable, and a Market Score of 36 β higher than 15% of U.S. zip markets.
Versus Pennsylvania
How 18932 compares with the state
Installed cost
$0.39/W below
state median $5.99/W
Market score
36 vs 50
Pennsylvania scores 50
Share of state installs
0.01%
of 88.5K tracked statewide
Battery attach
0.0%
state 0.0%
Statewide momentum
β² 48.7%
residential solar added in Pennsylvania, 12 months through Jul 2026
Statewide market
105.3K systems
2.8% of homes Β· utility-reported through Jul 2026
Growth & pricing
18932 by year
1 installs in the trailing twelve months vs 1 before
Installations by year
Median installed cost, $/W DC by year
Installer comp set
Who installs in 18932
Ranked by systems recorded in this zip
| # | Installer | Installs | 12-mo | Avg kW | $/W |
|---|---|---|---|---|---|
| 1 | ASTRUM SOLAR | 1 | 0 | 10.26 | $5.20 |
| 2 | SUNPRIME ENERGY | 1 | 0 | 13.2 | $6.00 |
Equipment
What gets installed in 18932
Share of systems with a recorded brand
Modules
GRAPE SOLAR50.0%
SUNTECH POWER50.0%
Inverters
ENPHASE ENERGY50.0%
SMA AMERICA50.0%
Frequently asked
Quick answers about 18932
How many solar installations are there in 18932?
SolarDNA counts 9 active solar installations in Line Lexington 18932, 9 of them residential, with data through June 8, 2026.
How much does solar cost in 18932?
The median residential system in 18932 cost $5.60 per watt over the trailing twelve months, $0.39/W below the Pennsylvania median.
Is solar growing in 18932?
Recent growth cannot be measured yet for 18932: too few recent installs (data runs through June 8, 2026).
Who installs solar in 18932?
ASTRUM SOLAR, SUNPRIME ENERGY lead the 2 installers with systems in 18932. The full comp set is above.
Is 18932 a good market for solar sales?
18932 scores 36 out of 100 (Fair, higher than 15% of U.S. zip markets). With under 500 installations the score is provisional.