Installers / STRONGHOLD ENGINEERING
STRONGHOLD ENGINEERING
Active in 1 state · first install 2010-04-07 · latest 2024-09-13
Installations
29
Capacity
8.9K kW
Last 12 months
0
▼ 100.0% vs prior 12 mo
Footprint
1 states
CA
By state
| State | Rank | Installs | 12 mo | Avg kW | $/W | Battery % | Zips |
|---|---|---|---|---|---|---|---|
| California | #2502 | 29 | 0 | 305.35 | $4.26 | 6.9 | 18 |