Installers / PAV ENGINEERING
PAV ENGINEERING
Active in 1 state · first install 2021-03-10 · latest 2026-04-27
Installations
167
Capacity
686 kW
Last 12 months
150
▲ 837.5% vs prior 12 mo
Footprint
1 states
CA
By state
| State | Rank | Installs | 12 mo | Avg kW | $/W | Battery % | Zips |
|---|---|---|---|---|---|---|---|
| California | #995 | 167 | 150 | 4.11 | $3.38 | 0.6 | 18 |